Tutorial for Connecting HDPE Pipes Compression Joint

Tutorial for Connecting HDPE Pipes Compression Joint


The installation of HDPE (High-Density Polyethylene) pipes to a compression joint is done using a mechanical connection method that relies on a threaded system and rubber rings to ensure a tight and leak-proof joint. Below are the installation steps:

  1. Preparation

    • Ensure that the HDPE pipe and compression joint are clean and free from dirt.
    • Cut the pipe to the appropriate length and make sure the end is even and free from burrs or rough edges.
  2. Installing the Compression Joint

    • Disassemble the compression joint, which consists of a locking nut, clamping ring, rubber ring, and fitting body.
    • Insert the locking nut onto the pipe end, followed by the clamping ring and rubber ring.
    • Push the pipe end into the fitting body, ensuring it passes through the rubber ring and fits securely.
  3. Tightening

    • Ensure the pipe is correctly positioned and fully inserted into the fitting.
    • Tighten the locking nut by hand first, then use a pipe wrench or a special wrench to secure the connection tightly.
    • Check that the joint is properly installed and there are no leaks.
  4. Testing

    • After installation, perform a pressure test or water flow test to ensure there are no leaks in the joint.
    • If leakage occurs, recheck the rubber ring position and ensure the locking nut is properly tightened.

This method is ideal for installing small to medium diameter HDPE pipes in clean water systems, irrigation, and industrial applications. The advantage of the compression joint system is its ease of installation, no need for special tools, and the ability to be disassembled and reinstalled if needed.


 Download